Solutions

Planning, design, and the permit counts, in that order.

The same project can answer a go or no-go, then a splice plan, then the quantities a railroad or a rock clause needs. You do not start over between them.

01

Feasibility

Upload the locations and the roads you already have. Run the design with the splice plan off. You get a route, hub and OLT counts, and a bill of materials fast enough to decide whether the area is worth a full design.

02

Outside plant design

Turn the splice plan on when the area is real. Cable sizes, hub tails, PLCs, and the splice matrix are built per OLT area.

03

Permitting

The bill separates construction miles from duct footage, lists bedrock depth along the conduit, and counts railroad crossings by operator.

04

A second look at On The Way homes

Keep the served design as the one you price first. Add passing homes only inside their drop, and only along the roads. Compare the two bills.